Pressure-sensitive asphalt cold patch material

Pressure-sensitive asphalt cold patch material

Open bag and use, no heating required. Polymer-modified formula suitable for all weather conditions (can be applied in rain, snow, and freezing). Traffic can resume immediately after compaction. Suitable for roads, parking lots, and industrial floors.

Product images are for reference only. Actual packaging, specifications, and markings should be confirmed through consultation.

Product Details

Working Principle: Explains the "pressure-sensitive activation" mechanism—compaction activates the polymer-modified asphalt, enabling aggregate interlock and bonding with the existing pavement. Over time, the solvent evaporates, and the strength continues to increase.

Основні переваги:

  • Zero heating → Saves equipment cost All-weather → not limited by weather
  • негайне відкриття руху → не впливає на транспорт
  • відчуття ущільнення → ущільнення тобто зв'язування
  • Ultra-long shelf life → unopened 24 months Multi-purpose → potholes, trench backfill, cracks, etc.

Material Composition:

полімеромодифікований бітум + добавка для холодного ремонту Фракційні заповнювачі (щебінь, пісок, наповнювач) біорозкладний пом'якшувач

  • Zero VOC, no diesel solvents

Product Features

# особливість Explanation
1 всепогодне будівництво-20°C to +50°C can be used
2 No heating required Відкрийте пакет і використовуйте одразу
3 Immediate opening to traffic Open to traffic immediately after compaction
4 чутливе до тиску склеювання compaction-activated bonding mechanism
5 durabilityUnder normal traffic conditions, 3-5 years of service life
6 екологічно чиста формулаZero VOC, biodegradable
7 надзвичайно тривалий термін зберігання Зберігати герметично 24 місяців
8 Easy installationSpade + tamping is sufficient

Application Scenarios

  1. Road/Motorway Pothole Repair — Emergency and Planned Repair
  2. Car Park Maintenance — Commercial/Residential/Retail Car Parks
  3. муніципальні дороги — міські дороги, перехрестя, тротуари
  4. Industrial/Factory Ground — Factory road, loading/unloading area
  5. Pipeline trench backfill — water/gas/electricity/communications excavation backfill
  6. Residential/community roads — property maintenance, school zones
  7. Airport Apron/Taxiway — Non-critical Area Repair
  8. Bridge deck/Ramp — Local repair

Етапи будівництва

кроки ОпераціяKey points
1 Clean potholes Remove loose materials, standing water, trim edges neatly, minimum depth 25mm
2Adhesive coating layer (optional) Суху/запилену поверхню можна обприскати водою або нанести емульсійний бітум.
3 filling materialDirectly pour into the trench, extra high 10-15mm
4 Flatten Рівномірно розподілити лопатою/скребком
5 compactВібраційна плита > Ручне трамбування > Укочування транспортними засобами, пошарове ущільнення глибоких ям (кожен шар 50mm)
6 відкрито рухOpen to traffic immediately after compaction; avoid concentrated static load within 48 hours.

Потрібна допомога? WhatsApp enquiry