pressure-sensitive asphalt cold patch material

pressure-sensitive asphalt cold patch material

Open bag and use directly, no heating required. Polymer-modified formula is suitable for all weather conditions (can be applied in rain, snow, and freezing temperatures). Traffic can be opened immediately after compaction. Suitable for roads, parking lots, and industrial floors.

Product images are for reference only. Actual packaging, specifications, and markings should be confirmed through consultation.

Product Details

Working Principle: Explains the "pressure-activated" mechanism—compaction activates the polymer-modified asphalt, aggregate interlocking locks it in place, and bonds it to the old pavement. Over time, the solvent evaporates, and the strength continues to increase.

Core advantages:

  • Zero heating → saves equipment cost all-weather → not limited by weather Immediate opening to traffic → does not affect traffic Sensing compaction → Compaction is bonding
  • Extra-long shelf life → unopened 24 months
  • Multi-purpose → potholes, trench backfill, cracks, etc.

Material Composition:

  • Polymer modified asphalt + Cold patch additive Graded aggregate (crushed stone, sand, filler) biodegradable softener Zero VOC, no diesel solvents.

Product Features

# FeaturesDescription
1 all-weather construction-20°C to +50°C can be used.
2 No heating required Open and use
3 Immediate opening to traffic Open to traffic immediately after compaction.
4 pressure-sensitive adhesion compaction activation bonding mechanism
5 DurabilityUnder normal traffic conditions, 3-5 year service life.
6 Eco-friendly formulaZero VOC, biodegradable
7 Ultra-long shelf lifeStore sealed for 24 months
8 Easy installation Shovel + tamp is sufficient

Application Scenarios

  1. Road/Highway Pothole Repair — Emergency and Planned Repair
  2. Parking Lot Maintenance — Commercial/Residential/Retail Parking Lot
  3. Municipal Roads — City roads, intersections, sidewalks
  4. Industrial/Factory Ground — Plant roads, loading and unloading areas
  5. Pipe Trench Backfill — Backfill after excavation for water/gas/electricity/communications
  6. Residential/Community Roads — Property maintenance, school zone
  7. Airport Apron/Taxiway — Non-critical area repair
  8. Bridge deck/Ramp — Partial repair

Construction Steps

Actions Key points
1 Clean potholes Remove loose material, standing water, trim edges neatly, minimum depth 25mm
2 Adhesive coating layer (optional) Dry/dusty surfaces can be sprinkled with water or coated with emulsified asphalt.
3 filling material Directly pour into the pit, superelevation 10-15mm
4 Flatten Use a shovel/scraper to spread evenly.
5 CompactionPlate compactor > Hand tamper > Vehicle rolling, deep pit layered compaction (each layer 50mm)
6 open to trafficImmediately open to traffic after compaction, avoid concentrated static load within 48h

Need help? WhatsApp Consultation